[1]
I. I. Susanti and F. Rimawan, “Cost and Time Analysis of the Acceleration Earthworks with the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project”, Quant. Econ. Manag. Stud., vol. 2, no. 6, pp. 345–354, Feb. 2021.