Susanti, I. I. and Rimawan, F. (2021) “Cost and Time Analysis of the Acceleration Earthworks with the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project”, Quantitative Economics and Management Studies, 2(6), pp. 345–354. doi: 10.35877/454RI.qems324.