(1)
Susanti, I. I.; Rimawan, F. Cost and Time Analysis of the Acceleration Earthworks With the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project. Quant. Econ. Manag. Stud. 2021, 2, 345–354.