[1]
Susanti, I.I. and Rimawan, F. 2021. Cost and Time Analysis of the Acceleration Earthworks with the Method of Adding Heavy Equipment to the Depok-Antasari Toll Road Project. Quantitative Economics and Management Studies. 2, 6 (Feb. 2021), 345–354. DOI:https://doi.org/10.35877/454RI.qems324.