The development of connectivity infrastructure, particularly toll roads, is planned to continue expanding and reach 3,500 km by 2030. This signifies a positive outlook for the construction industry. This research conducted to analyse the management of post tension raw materials and determine the optimal policies using the discrete-event simulation method. Simulation scenarios were developed using the Arena application, taking into consideration the demand patterns for post tension work. The validation test results confirmed the capability of the base case model in accurately representing real-world conditions. Scenario development was carried out to influence the strand inventory pattern by incorporating reorder points and adjusting order sizes. Based on the scenario analysis, the most effective approach was found to be setting a reorder point of 3 tons and an order size of 5 tons. The implementation of this analysis successfully reduced the strand inventory by 58.78%. This research enables companies to optimize their inventory, reduce costs, and enhance operational efficiency. The findings contribute to the development of strategies that support sustainable growth in connectivity infrastructure in Indonesia.

Keywords

References (21)

  1. Altiok, Tayfur, & Benjamin, Melamed. (2020). Simulation Modeling and Analysis with Arena (Vol. 21).
  2. Beske-Janssen, Philip, Johnson, Matthew Phillip, & Schaltegger, Stefan. (2015, September). 20 years of performance measurement in sustainable supply chain management – what has been achieved? Supply Chain Management, Vol. 20, pp. 664–680. https://doi.org/10.1108/SCM-06-2015-0216
  3. Dadang. (2017). Keuntungan Beton Prategang dalam Infrastruktur Sipil.
  4. Davoli, Giovanni, & Melloni, Riccardo. (2012). A proposed approach to extend the Economic Order Quantity (EOQ) model using discrete event simulation. IFIP Advances in Information and Communication Technology, 384 AICT, 45–53. https://doi.org/10.1007/978-3-642-33980-6_6
  5. Diphohusodo, Istimawan. (1993). Struktur Beton Bertulang. Departemen Pekerjaan Umum RI.
  6. fib bulletin 31. Post-tensioning in buildings. , International Federation for Structural Concrete Technical report § (2005).
  7. Heizer, Jaz, & Render, Barry. (2020). Operations Management Sustainability and Supply Chain. Pearson.
  8. Hsu, Pei Yuan, Angeloudis, Panagiotis, & Aurisicchio, Marco. (2018). Optimal logistics planning for modular construction using two-stage stochastic programming. Automation in Construction, 94(June), 47–61. https://doi.org/10.1016/j.autcon.2018.05.029
  9. Kementerian Bidang Perekonomian. (2022). Peraturan Menteri Koordinator Bidang Perekonomian Republik Indonesia.
  10. Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2020). RENCANA STRATEGIS Tahun 2020-2024.

How to Cite

Dyahnawangsari, F. O., & Kusumastuti, R. D. (2024). Strand Inventory Analysis of Post Tension in PT XYZ Using Discrete-Event Simulation Method. Quantitative Economics and Management Studies, 5(2), 361–371. https://doi.org/10.35877/454RI.qems2495