Subcontractor Selection Strategy to Minimize Subcontractor Performance Problems Using Analytical Hierarchy Process Method: Case Study at PT. Hutama Karya Infrastruktur

  • Rohmat Danang Nur Riyadi Universitas Indonesia (ID)
  • A Arviansyah Universitas Indonesia (ID)
Keywords: Analytical Hierarchy Process, Expert Choice, Subcontractor

Viewed = 0 time(s)

Abstract

The construction industry shares about 13,4% of the world output in the business field. Subcontractor selection process will have a major effect on the performance results of a construction project. This study will focus on the subcontractor selection strategy to minimize subcontractor performance problems using the Analytical Hierarchy Process (AHP) method assisted by expert choice software in PT. Hutama Karya Infrastruktur. AHP is widely used in construction management research because its permanent ability to deal with many types of decisions. There are five criteria used as research variables, namely price, administration, resources, performance and quality, and partnership strategy. The results showed that price is not the top priority in choosing subcontractors, but the top priorities are performance and Quality, Health, Safety, Security, and Environment (QHSSE). The main sub-criteria on performance and QHSSE are work method and production capacity, this shows that the way of completion or work method and production capacity of equipment or supporting equipment of subcontractors in working on a project were the main priorities.



References

Abbasianjahromi, Hamidreza, Sepehri, Mehran, & Abbasi, Omid. (2018). A decision-making framework for subcontractor selection in construction projects. Engineering Management Journal, 30(2), 141–152. https://doi.org/https://doi.org/10.1080/10429247.2018.1448967
Boran, Fatih Emre, Gen�, Serkan, Kurt, Mustafa, & Akay, Diyar. (2009). A multi-criteria intuitionistic fuzzy group decision making for supplier selection with TOPSIS method. Expert Systems with Applications, 36(8), 11363–11368. https://doi.org/https://doi.org/10.1016/j.eswa.2009.03.039
Choudhry, Rafiq M., Hinze, Jimmie W., Arshad, Muhammad, & Gabriel, Hamza F. (2012). Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering and Management, 138(12), 1353–1359. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0000562
Clough, Richard H., Sears, Glenn A., & Sears, S. Keoki. (2000). Construction project management. John Wiley & Sons.
Darko, Amos, Chan, Albert Ping Chuen, Ameyaw, Ernest Effah, Owusu, Emmanuel Kingsford, P�rn, Erika, & Edwards, David John. (2019). Review of application of analytic hierarchy process (AHP) in construction. International Journal of Construction Management, 19(5), 436–452. https://doi.org/https://doi.org/10.1080/15623599.2018.1452098
El-khalek, Hesham A., Aziz, Remon F., & Morgan, Enas S. (2019). Identification of construction subcontractor prequalification evaluation criteria and their impact on project success. Alexandria Engineering Journal, 58(1), 217–223. https://doi.org/https://doi.org/10.1016/j.aej.2018.11.010
Kurniawan, Rifki, Hasibuan, Sawarni, & Nugroho, Rosalendro Eddy. (2017). Analisis kriteria dan proses seleksi kontraktor chemical sektor Hulu Migas: aplikasi metode Delphi-AHP. MIX: Jurnal Ilmiah Manajemen, 7(2), 154538.
Love, Peter E. D., Teo, Pauline, Ackermann, Fran, Smith, Jim, Alexander, James, Palaneeswaran, Ekambaram, & Morrison, John. (2018). Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction. Production Planning & Control, 29(5), 353–366. https://doi.org/https://doi.org/10.1080/09537287.2018.1424961.
Muhendra, H, Hasibuan, S., & Buana, U. M. (2018). Selection of Fly Over Construction Project Sub-Contractor The Sub-Contractor Selection of Fly Over Construction Project. Journal of Transportation and Logistics Management, 5(01), 43–54.
Muhendra, Hery, & Hasibuan, Sawarni. (2018). Seleksi Sub-Kontraktor Proyek Konstruksi Jalan Layang. Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG), 5(1), 43–54. https://doi.org/http://dx.doi.org/10.54324/j.mtl.v5i1.213
Shapira, Aviad, & Goldenberg, Marat. (2005). AHP-based equipment selection model for construction projects. Journal of Construction Engineering and ManagementShapira, Aviad, & Goldenberg, Marat. (2005). AHP-Based Equipment Selection Model for Construction Projects. Journal of Construction Engineering and Management, 131(12), 1263–1273., 131(12), 1263–1273. https://doi.org/https://doi.org/10.1061/(asce)0733-9364(2005)131:12(1263)
Shemshadi, Ali, Toreihi, Mehran, & Shirazi, Hossein. (2011). Supplier selection based on supplier risk: An ANP and fuzzy TOPSIS approach. https://doi.org/https://doi.org/10.22436/jmcs.002.01.12
Published
2023-06-18
Section
Articles
How to Cite
Danang Nur Riyadi, R., & Arviansyah, A. (2023). Subcontractor Selection Strategy to Minimize Subcontractor Performance Problems Using Analytical Hierarchy Process Method: Case Study at PT. Hutama Karya Infrastruktur. Quantitative Economics and Management Studies, 4(4), 794-800. https://doi.org/10.35877/454RI.qems1830