Articles | 2023-08-31

Economic Feasibility Analysis Based on Reservoir Storage Capacity on the Construction of the Rongkong Multipurpose Dam

Elang Timur M. Patih Ragananda, Ussy Andawayanti, Evi Nur Cahya
Quantitative Economics and Management Studies, Vol. 4 No. 4 (2023), pp. 675-682 https://doi.org/10.35877/454RI.qems1817 Published: 2023-08-31
Get Permissions

Abstract

The construction of Rongkong Multipurpose Dam located in North Luwu Regency, South Sulawesi aims to provide irrigation water, water supply, and increase electricity production capacity through hydropower with 6 construction sites under consideration. Economic feasibility analysis was carried out to obtain construction sites that have the best economic feasibility objectively. In this analysis, the parameters of Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), and Benefit-Cost Ratio (BCR) were calculated by considering the reservoir storage capacity in each sites. The result from this analysis shows that Site Tandung 2 is the location that has the best economic feasibility with reservoir capacity of 23,400 million m3 and Benefit- Cost Ratio (BCR) of 2.490.

Keywords

References (10)

  1. Blank, L., & Tarquin, A. (2012). Enginnering Economy.
  2. BPS. (2021a). Kabupaten Luwu Utara dalam Angka (1st ed.).
  3. BPS. (2021b). Provinsi Sulawesi Selatan Dalam Angka. In BPS Sulawesi Selatan (Vol. 1). https://doi.org/10.1016/j.eneco.2022.106065
  4. Drs. M. Giatman. (2006). Ekonomi Teknik.
  5. Fraser, N. M., & Jewkes, E. M. (2012). Engineering Economics: Financial Decision Making for Engineers. Pearson Education Canada. https://books.google.co.id/books?id=Q4xYngEACAAJ
  6. Ihum, J., & Stephen, F. (2018). A Cost and Benefit Analysis of Kashimbilla Multipurpose Dam Project in Takum, Taraba State, Nigeria.
  7. Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2021). Preparation of Rongkong Multipurpose Dam: Review Feasibilty Study Report.
  8. Park,S, C. (2013). Fundamentals of Engineering Economics (3rd ed.). Auburn University. http://www.pearson.com/us/higher-education/product/Park-Fundamentals-of-Engineering-Economics-3rd-Edition/9780132775427.html?tab=overview
  9. Pradany, A. D., Juwono, P. T., & Andawayanti, U. (2020). ANALISA KELAYAKAN EKONOMI: STUDI KASUS PADA PROYEK PEMBANGUNAN BENDUNGAN KUWIL KAWANGKOAN.
  10. SULLIVAN,G, W., WICKS, M. E., & KOELLING, C. P. (2012). ENGINEERING Economy.

How to Cite

Ragananda, E. T. M. P., Andawayanti, U. ., & Cahya, E. N. . (2023). Economic Feasibility Analysis Based on Reservoir Storage Capacity on the Construction of the Rongkong Multipurpose Dam. Quantitative Economics and Management Studies, 4(4), 675–682. https://doi.org/10.35877/454RI.qems1817