Economic Feasibility Analysis Based on Reservoir Storage Capacity on the Construction of the Rongkong Multipurpose Dam

  • Elang Timur M. Patih Ragananda Departemen Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya, Malang, Indonesia (ID)
  • Ussy Andawayanti Departemen Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya, Malang, Indonesia (ID)
  • Evi Nur Cahya Departemen Teknik Pengairan, Fakultas Teknik, Universitas Brawijaya, Malang, Indonesia (ID)
Keywords: multipurpose dam, reservoir storage capacity, benefit-cost ratio, economic feasibility

Viewed = 0 time(s)

Abstract

The construction of Rongkong Multipurpose Dam located in North Luwu Regency, South Sulawesi aims to provide irrigation water, water supply, and increase electricity production capacity through hydropower with 6 construction sites under consideration. Economic feasibility analysis was carried out to obtain construction sites that have the best economic feasibility objectively. In this analysis, the parameters of Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), and Benefit-Cost Ratio (BCR) were calculated by considering the reservoir storage capacity in each sites. The result from this analysis shows that Site Tandung 2 is the location that has the best economic feasibility with reservoir capacity of 23,400 million m3 and Benefit- Cost Ratio (BCR) of 2.490.



References

Blank, L., & Tarquin, A. (2012). Enginnering Economy.

BPS. (2021a). Kabupaten Luwu Utara dalam Angka (1st ed.).

BPS. (2021b). Provinsi Sulawesi Selatan Dalam Angka. In BPS Sulawesi Selatan (Vol. 1). https://doi.org/10.1016/j.eneco.2022.106065

Drs. M. Giatman. (2006). Ekonomi Teknik.

Fraser, N. M., & Jewkes, E. M. (2012). Engineering Economics: Financial Decision Making for Engineers. Pearson Education Canada. https://books.google.co.id/books?id=Q4xYngEACAAJ

Ihum, J., & Stephen, F. (2018). A Cost and Benefit Analysis of Kashimbilla Multipurpose Dam Project in Takum, Taraba State, Nigeria.

Kementerian Pekerjaan Umum dan Perumahan Rakyat. (2021). Preparation of Rongkong Multipurpose Dam: Review Feasibilty Study Report.

Park,S, C. (2013). Fundamentals of Engineering Economics (3rd ed.). Auburn University. http://www.pearson.com/us/higher-education/product/Park-Fundamentals-of-Engineering-Economics-3rd-Edition/9780132775427.html?tab=overview

Pradany, A. D., Juwono, P. T., & Andawayanti, U. (2020). ANALISA KELAYAKAN EKONOMI: STUDI KASUS PADA PROYEK PEMBANGUNAN BENDUNGAN KUWIL KAWANGKOAN.

SULLIVAN,G, W., WICKS, M. E., & KOELLING, C. P. (2012). ENGINEERING Economy.

Published
2023-06-16
Section
Articles
How to Cite
Ragananda, E. T. M. P., Andawayanti, U., & Cahya, E. N. (2023). Economic Feasibility Analysis Based on Reservoir Storage Capacity on the Construction of the Rongkong Multipurpose Dam. Quantitative Economics and Management Studies, 4(4), 675-682. https://doi.org/10.35877/454RI.qems1817